![](https://www.ipohecho.com.my/wp-content/uploads/2020/03/1-Page7b-780x470.jpg)
![](https://www.ipohecho.com.my/wp-content/uploads/2020/03/1-Page7b-780x470.jpg)
By A. Jeyaraj
In issue 321 (February 16-29, 2020) of Ipoh Echo, there was a complaint about a redundant railway line across Connolly Road being a speed breaker and the danger to traffic. MBI has taken prompt action and paved the road. When I was driving along the road, I slowed down at the location and then realised that the road has been paved. While taking photos, I noticed cars slowing down without realising the road was paved.
Why did MBI have to wait for a complaint to do this?